Finishing Eaves & More Windows

Things are starting to move quite quick. On Monday, the guys started finishing out the eaves with Hardie products. That’s looking great. At the same time, all the windows that we have onsite were installed. We’re still missing 3 windows. Home Depot has received them but seems to be struggling to locate them. Finally, the plumber was there knocking out vent pipes and drain connections. There’s a lot going on!

Here are a couple of pictures of the windows. I forgot to take a picture of the eaves.

Living Room windows. The gap in the middle will be a 12ft sliding door (three 4 ft sections).

Dining Room (right) and Kitchen (left) windows.

Share