The insulation folks finished the spray foam in all the exterior walls (as well as the walls between garage/office and workshop/primary bedroom). Tomorrow they’ll be doing all the batt & blown-in insulation. This is all of the attic space as well as a number of the interior walls (primarily for noise reduction).
Guest Bedroom with insulation
Office with insulation
Kitchen (left) and Dining Room (right) with wall insulation. Ceiling will be fiberglass batting.
Workshop back wall
The exterior brick work will start Monday. The mason was able to find a match for the original brick so we should have a consistent view for everything, except possibly the back wall).
In crazy news, someone ran into the eave again - in the exact same place as before. We think it was the electrician this time. It’s already been replaced. Hopefully for the last time!